<rt id="eqeyq"><delect id="eqeyq"></delect></rt><rt id="eqeyq"><tr id="eqeyq"></tr></rt>
  • <rt id="eqeyq"></rt><abbr id="eqeyq"></abbr>
    <button id="eqeyq"><input id="eqeyq"></input></button>
    <bdo id="eqeyq"></bdo>
    <table id="eqeyq"></table>
    好獵頭網-中高級人才獵頭網站!服務熱線:400-1801-668 好獵頭   |   登錄 注冊

    CONTRACT FOR PROCESSING

    添加時間:2017-11-26 23:59:50
    瀏覽次數: 0
      messrs: _________________________________
        industry ltd. (hereinafter called party a)
      and
      industry ltd. (hereinafter called party b)
      have agreed that party b shall manufacture standard magnetic
      compasses in____________ with all necessary parts and materials supplied by party a under the following terms and conditions:
      1. commodity and quantities for processing with supplied materials and assembling with supplied parts:
      (1) commodity-standard magnetic compass;
      (2) quantity-____________sets in total.
      2. all necessary parts and materials listed in the contract shall either be supplied by party a or purchased in ____________ or by party b;
      3. the processing charge for each model is as follows:
      (1) standard magnetic compass of type glc-1 at u. s. $
      ____________(say: _________________u. s. d) each;
      (2) standard magnetic compass of type glc-2 at u. s. $
      _____________(say: ________________ u. s. d) each;
      (3) standard magnetic compass of type glc-3 at u. s. $
      ____________(say: ___________u. $. d) each.
      4. the main parts, consumables and materials required for processing will be sent to (place) by party a and if there is any shortage or damage, party a should be held responsible for supplying replacements;
      5. party a should pay party b by l/c or t/t covering the full amount of processing charges and costs of parts, consumables and materials purchased in__________or____________by party b one month before shipment of the finished products;
      6. party b must complete the manufacturing of all standard magnetic compasses of type glc-1 and effect shipment within the agreed date without delay except in the occurrence of uncontrollable and unforceeable events ;
      7. the damage rate of parts and materials:
      the damage rate of parts and materials in processing is __________% and such a damage rate of parts and materials shall be supplied free by   party a, should the damage rate exceed _____________ % , party b shall supply additional materials
    and necessary parts;
      8. should shipment of materials and parts sent by party a be wrong or in excess, party b shall return the excessive portion at the expense of party a, in case of short shipment, party a shall make up the shortage;
      9. all parts and materials supplied by party a for standard magnetic compasses shall be processed by party b strictly in accordance with the design without any modification;
      10. technical service:
      party a agrees to send technicians to______________to help training party b,s technicians at the request of the latter at any time and allows the technicians to remain with party b for inspection of the finished products. in such case, party b agrees to pay a monthly salary of u. s. $ ____________ for each person, all other expenses (including roun d trip tickets) will be borne by party a;
      11. all import and export formalities in connection with this contract should be handled by party b;
      12. all standard magnetic compasses processed by party b shall be shipped to the foreign buyers appointed by party a at any
    time;
      13. other terms and conditions:
      (1) the trade marks of standard magnetic compass shall be supplied by party a, should there be any legal dispute, party a shall be held fully responsible;
      (2) the quality of parts and materials, if necessary, purchased in__________ or_____________ by party b for standard magnetic compasses must measure up to standard and be approved by party a beforehand;
      (3)for promotional purposes, party b shall prepare samples of standard magnetic compass at any time and send them to foreign buyers appointed by party a , all parts
    and materials required would be supplied out of the stock supplied by party a;
      14. this contract shall be made in triplicate, party a and party b shall, both signing all copies, retain one copy and submit one to authorities concerned in (place) for registration.
      industry ltd.   industry ltd.
      ________            ____________
      manager             manager 
    主站蜘蛛池模板: 顺平县| 正蓝旗| 天全县| 慈利县| 綦江县| 互助| 凤翔县| 襄汾县| 灵寿县| 绵竹市| 庆阳市| 武鸣县| 乌什县| 利津县| 义乌市| 大方县| 乌鲁木齐县| 全南县| 林周县| 南通市| 恩平市| 镇雄县| 定陶县| 景泰县| 志丹县| 剑川县| 棋牌| 来宾市| 武山县| 襄城县| 白银市| 藁城市| 宿迁市| 高唐县| 芦溪县| 伊川县| 阳信县| 肥西县| 岑巩县| 临朐县| 福建省|